Skip to main content
Process

Epoxy & Polyurethane Flooring Process in KL

A step-by-step process page for epoxy & polyurethane flooring, including preparation, execution, quality checks, and warranty handover.

Key takeaways

01: Substrate Assessment
02: Diamond Grinding
03: Primer Application
04: Body Coat / Broadcast
05: Topcoat & Curing

Practical guidance for KL & Selangor

Malaysian homes face tropical humidity, fast rain cycles, condo management rules, and mixed construction materials. That means the right method depends on surface condition, access, safety requirements, and whether water or structural movement is involved.

The safest approach is to shortlist the likely cause, collect clear photos, confirm the property type, and request an itemised fixed-price quotation. KL Servis Rumah confirms scope before work begins and avoids arbitrary pricing.

More from this category

Related Epoxy & Polyurethane Flooring resources

More from this category

Related reading

Process — 6 more guides

Need help applying this to your property?

Send your photos, area, and preferred timing. Our dispatch desk will help identify the suitable service and quote you a fair, upfront price.

FAQs

How long does epoxy flooring take to install and cure?

Most residential garage or showroom projects (300–500 sq ft) take 3 to 4 days including grinding, primer, body coat, and topcoat. Light foot traffic is allowed after 24 hours, vehicle traffic after 72 hours, and full chemical resistance after 7 days. We will schedule around your access needs.

Will my epoxy floor turn yellow in the sun?

Standard aromatic epoxy does yellow with UV exposure. To prevent this, we always apply a UV-stable aliphatic polyurethane topcoat (e.g., Sika, BASF, or RPM products). This topcoat is crystal-clear and stays clear for 10+ years even in direct sun-exposed areas like car porches and outdoor walkways.

Can epoxy be applied over existing tiles?

Generally not recommended. Epoxy needs to bond directly to a sound concrete substrate. We typically remove existing tiles (we can include this in the quote) and grind the underlying concrete. In some cases, an existing epoxy floor can be recoated without removal — we assess this case by case.

Is epoxy flooring slippery when wet?

Standard self-levelling epoxy is smooth and can be slippery when wet, especially in commercial kitchens or pool decks. For these areas, we recommend a broadcast quartz or flake system with a fine-grit topcoat additive that delivers P4–P5 slip rating (AS/NZS 4586) without sacrificing cleanability.

+60 11-1662 7349WhatsApp usinfo@klservisrumah.myJalan Kiara, Mont Kiara, 50480 Kuala Lumpur
Get a fixed quote on WhatsApp Call us