Skip to main content
Back to Knowledge Hub
Glass & Aluminium

Glass & Aluminium Fabrication in Kuala Lumpur & Selangor

By KL Servis Rumah Editorial Team
2026-07-18
9 min read

Glass and aluminium work is measured work. Nothing comes off a shelf: the shower screen is cut to your bathroom, the window is fabricated to your opening, the partition is sized to your ceiling height. That is why quotes vary so much between contractors — and why an accurate site measurement matters more than the brochure.

Direct answer: KL Servis Rumah fabricates and installs glass and aluminium across Kuala Lumpur and Selangor from RM 320. Frameless shower screens start at RM 420 per panel, aluminium sliding windows at RM 320 per sq ft, glass office partitions at RM 220 per sq ft, and wall mirrors at RM 320. Shower screen seals carry a 12-month leak-free and hardware warranty.

What we fabricate and install

  • [Frameless shower screen](/services/glass-aluminium/frameless-shower-screen) — 10–12mm tempered glass cut to your bathroom, with concealed hinges, drip-edge design and anti-leak seals. From RM 420 per panel.
  • [Aluminium sliding window](/services/glass-aluminium/aluminium-sliding-window) — fabricated to your opening with 5mm clear or tinted glass, nylon rollers and weatherstrip. From RM 320 per sq ft.
  • [Glass office partition](/services/glass-aluminium/glass-office-partition) — 10–12mm tempered partition with aluminium or frameless channel, door and hardware included. From RM 220 per sq ft.
  • [Wall mirror installation](/services/glass-aluminium/wall-mirror-installation) — 5–6mm silver-backed mirror with concealed aluminium channel fixings for bathrooms, gyms and dressing rooms. From RM 320.

We also fit swing glass doors, top-hung awning windows, louvre windows and casement windows as part of the same fabrication scope.

Fabrication vs repair — which one do you need?

New glass and aluminium is not always the answer. A large share of enquiries we receive are repairs on existing units.

Your situationThe right scope
Glass cracked or shattered, frame is fineGlass replacement
Rain comes in but glass is intactWindow seal replacement
Sash will not slideSliding window stuck
Frame corroded, warped or beyond adjustmentNew aluminium fabrication
Shower screen leaks at the base or hingeShower screen leaking
No screen yet, or a full bathroom re-doNew frameless screen

If the frame is sound, repair is usually cheaper and faster. We say so on site rather than quoting a replacement by default. General repair work sits under window repair.

Choosing glass: thickness, safety and tint

Glass selection is the single biggest driver of both safety and cost.

  • Tempered (toughened) — heat-treated so it breaks into small blunt granules instead of shards. Mandatory thinking for shower screens, doors and partitions. We do not use ordinary annealed glass in wet or high-traffic areas.
  • Laminated — two panes bonded with an interlayer; holds together when broken. Useful for overhead glass and areas where fall-through is a risk.
  • 10mm — sufficient for a single fixed shower panel up to about 1.5m wide.
  • 12mm — for frameless doors or panels wider than 1.5m, and for full-height partitions.
  • 8mm — acceptable on framed or sliding shower designs.
  • 5mm clear or tinted — standard for aluminium sliding window infill.

On tint: clear glass gives maximum daylight; grey, bronze or green tint reduces solar heat gain and is a common choice for west-facing elevations in Klang Valley; frosted (acid-etched or sandblasted) gives privacy while still passing light; reflective coating adds daytime one-way privacy. We can show physical samples before you commit.

Aluminium profiles

We work with profiles from Akasia, Hua Ho and YKK AP, or custom powder-coated sections where a specific colour is required. Profile choice affects sash weight, glazing bead depth, weatherstrip type and how the frame handles wind-driven rain — not just the look.

Glass we specify comes from Malaysian certified manufacturers including Malaysian Sheet Glass, TechnoGlas and Xinyi Glass.

How a glass and aluminium job runs

  1. Site measurement and design — we measure the opening and record the constraints that matter: floor slope, drainage position, tile joints, plumbing behind the wall, ceiling height, wall condition.
  2. Quotation and lead time — an itemised quote covering glass, frame, hardware and installation. Tempered glass fabrication typically takes 5–7 working days; aluminium frames 3–5 working days.
  3. Fabrication — glass is cut, tempered and edge-polished at the factory. Aluminium is cut, mitred and powder-coated. Tempered glass cannot be trimmed after toughening, which is why measurement discipline matters.
  4. On-site installation — frames anchored with appropriate fixings, glass seated on setting blocks with structural silicone, hardware fitted and adjusted.
  5. Sealing and water test — for shower screens we run a water test to confirm the seal performs, then align hardware and hand over.

What it costs

ItemStarting price
Glass & aluminium works (general)From RM 320
Glass office partitionFrom RM 220 / sq ft
Aluminium sliding windowFrom RM 320 / sq ft
Wall mirror installationFrom RM 320
Frameless shower screenFrom RM 420 / panel

Final cost moves with glass thickness, panel size, hardware grade, powder-coat colour and access. High-rise installations that need lift protection, hoisting or management approval add time and are quoted after the site visit. For a rough replacement figure before you call, the glass replacement calculator and window replacement estimator are free to use.

What we check on site

  • Floor slope and drain position in the bathroom — a screen fitted against the fall will always pool water.
  • Whether the wall behind the tile is solid brick, block or stud, and where hidden pipes run.
  • Squareness of the opening. Old terrace openings are rarely true, and a frame forced into a skewed opening will bind.
  • Existing waterproofing condition. If the bathroom membrane has failed, a new screen will not stop the leak — see bathroom and wet area waterproofing.
  • Building management rules for facade changes on condominium windows and partitions.

Common mistakes

  • Ordering shower glass by tape measure without checking floor fall — the water runs the wrong way and the screen gets blamed.
  • Choosing 8mm frameless for a wide door because it is cheaper, then living with flex and hinge stress.
  • Sealing a screen with general-purpose silicone instead of sanitary-grade mould-resistant silicone.
  • Fitting a new window without clearing the drainage weep holes, so rain backs up over the sill.
  • Assuming a leaking window means new windows. Very often it is a perished seal or blocked weep hole.
  • Skipping condominium management approval for facade-visible work, then being asked to remove it.

Frequently asked questions

Can my existing shower screen be re-sealed instead of replaced?

Often yes. If the glass and frame are sound and only the silicone has gone black, mouldy or detached, we can strip the old silicone, clean the substrate and re-apply sanitary-grade mould-resistant silicone. That is a much smaller job than a new screen.

How long does tempered glass take to arrive?

Typically 5–7 working days for fabrication, and 3–5 working days for aluminium frames. Tempering is a factory heat process — it cannot be rushed, and the glass cannot be recut afterwards.

Do you install glass I bought myself?

We can look at it, but tempered panels are made to a specific size with pre-drilled holes for specific hardware. If the cutouts do not match the hinges or the channel, the panel cannot be modified. We prefer to measure and fabricate as one scope so responsibility for fit sits in one place.

Do you handle office partitions and shop fit-outs?

Yes. Full-height 10–12mm tempered partitions with aluminium or frameless U-channel, integrated swing or sliding doors, frosted film for privacy and acoustic laminated glass for meeting rooms.

Is tinted glass worth it in Klang Valley?

For a west-facing living room or a room that overheats every afternoon, yes — tint reduces solar heat gain noticeably. For a north or south elevation, clear glass usually makes more sense so you keep the daylight.

Get a measurement and quote

If you are planning a shower screen, new aluminium windows, a glass partition or a mirror wall, KL Servis Rumah measures and fabricates across Kuala Lumpur and Selangor. WhatsApp a photo of the opening with a rough size — request a glass & aluminium quote.

Expert Support DeskNeed help with Glass & Aluminium?

Our professional tradesmen serve all locations in KL & Selangor. Get an instant, free fixed-rate quote today!

Chat On WhatsApp
+60 11-1662 7349WhatsApp usinfo@klservisrumah.myJalan Kiara, Mont Kiara, 50480 Kuala Lumpur
Related Articles

More Home Maintenance Guides

Glass & Aluminium

Glass Office Partition in Kuala Lumpur & Selangor

A glass office partition should be specified as a complete system: safety-glass type and thickness, panel sizes, channels, doors, hardware, manifestation markings, ceiling support, privacy and acoustic needs. Price per square foot alone does not define performance.

8 min readRead More
Window Repair

Window Glass Replacement in KL & Selangor

Replace cracked, broken or fogged window glass in Kuala Lumpur and Selangor — clear, tinted, frosted or tempered, fitted to the existing frame. From RM 200.

8 min readRead More
Roof Repair

Gutter Cleaning & Realignment in Kuala Lumpur & Selangor

A gutter needs more than debris removal when water remains after rain, spills behind the fascia, or runs away from the downpipe. Cleaning restores capacity; realignment restores the fall; joint sealing stops local drips.

8 min readRead More
Ceiling

Gypsum Board Partition Walls in KL and Selangor

Need an extra bedroom, a home office or a sectioned-off shoplot without brickwork? Gypsum board partitions are fast, light and paint-ready — but the framing, board type and finishing decide whether the wall lasts.

7 min readRead More
Handyman

Handyman Services in Kuala Lumpur & Selangor

Reliable handyman services across KL & Selangor — TV wall mounting, door & lock repair, furniture assembly and curtains & shelves hanging, with fair fixed pricing.

6 min readRead More
Electrical

Heat Pump Water Heater Installation in KL & Selangor

A heat pump water heater moves heat from the surrounding air into a storage tank instead of producing all its heat through an electric resistance element. It is most suitable for landed homes with steady hot-water demand, a ventilated outdoor or utility location, drainage for condensate and enough space for both tank and heat-pump equipment.

8 min readRead More
Get a fixed quote on WhatsApp Call us